Village of Burbank, Ohio

Village of Burbank, Ohio

Council Meetings

Council meetings are held the first Thursday of the month. April through October we meet at 8:00 PM, November through March we meet at 7:00 PM.

100 West Middle Street
Burbank, Ohio

Meeting Dates for 2023

  • January 5th
  • February 7th
  • March 2nd
  • April 6th
  • May 4th
  • June 5th
  • July 6th
  • August 3rd
  • September 7th
  • October 5th
  • November 2nd
  • December 7th

Ordinance Notice

VILLAGE OF BURBANK

ORDINANCE: 2023-06 Adopted: 11/14/2023

This is a correction to an earlier posting on this Ordinance that incorrectly stated being Adopted on 11/2/2023 (the Agreement was Adopted on 11/2/2023, not the Ordinance).

An Ordinance approving a contract for Police Services from the Village of Creston, Wayne County, Ohio from January 1, 2024 through December 31, 2024 and declaring the same as an emergency.

ORDINANCE: 2023-07 Adopted: 11/14/2023

An Ordinance approving amending the 2023 Appropriations and declaring this an emergency for the public peace, health, safety and welfare.

The complete text of the Ordinances and/or Resolutions

may be obtained or viewed at the office of the Fiscal Officer

of the Village of Burbank by calling 330-667-3272.

December Council Meeting Notice

DECEMBER REGULAR MEETING

COUNCIL MEETING DATE: DECEMBER 7, 2023

RECORDS COMMISSION - START TIME: 6:50 PM

REGULAR MEETING START TIME: 7:00 PM

(WINTER HOURS START TIME)

Ordinance Notice

ORDINANCE: 2023-06 Adopted: 11/2/2023

An Ordinance approving a contract for Police Services from the Village of Creston, Wayne County, Ohio from January 1, 2024 through December 31, 2024 and declaring the same as an emergency.

November Council Meeting Notice

NOVEMBER REGULAR MEETING

COUNCIL MEETING DATE: NOVEMBER 2, 2023

REGULAR MEETING START TIME: 7:00 PM

(WINTER HOURS START TIME)

Trunk or Treat 2023


The Village of Burbank, Ohio will host its first Trunk or Treat on October 28, 2023 from 4 to 7 pm.

Adults are invited to pass out Treats from the trunk of a car, bed of a truck, table under a canopy, or whatever your imagination comes up with as long as it fits within your designated parking spots.

There will be a prize for best decorated trunk. You must be registered for a parking spot to be considered for the prize.

Children 0 through 18 years are invited to come partake of the treats being passed out. There will be prizes for the best costume in three age groups: 0-6 7-12 13-18

EnchantaRoo Face and Body Art will be available for face painting.

Donuts and cider will be provided by the Village.

Click here to see more.

Notice of Sidewalk Work

Residents and owners of properties on the EAST side of Front St.

Engineering Associates, Inc., on behalf of the Village, will be observing the construction to replace the sidewalks on the east side of Front Street.

The construction work is anticipated to begin the week of September 25, 2023, (subject to change) and will take approximately one month to complete, weather permitting.

Please be advised that any growth, obstructions, overhang, or other conditions that interfere with use or access to the sidewalks need to be corrected by property owners and occupants so this work can be done. The construction will require that an area 5’ from the east edge of the existing sidewalk for the work area be clear of obstructions, (this is the edge of the sidewalk facing your homes).

Ordinance 2022-08 of the Village calls for owners to correct “Any tree, shrub, or other growth that infringes on a sidewalk area and obstructs passage” and Ordinance 2018-05, Section 310.05 requires maintenance and cleaning of all public sidewalks shall be the responsibility of the property owner abutting the sidewalk.

Please see that these areas are cleaned and unobstructed so our engineering and construction teams can begin the work for the replacement of the sidewalk.

Sidewalk Along the East side of Front St.

The Village of Burbank has applied for a CBDG (Community Block Development Grant) for the repair and replacement of the full length of the sidewalk along the East side of Front St. within the Village limits. If awarded the grant at the state level, the sidewalk will be smooth and ADA compliant with no steps at the completion of the project.

If awarded the grant, our goal is to finish all work by October 31, 2023. This targeted date is subject to change based on weather, availability of contractors, and other factors beyond our control. Members of Engineering Associates of Wooster will be in the Village beginning next week to start the engineering and design process.

It is the responsibility of the homeowners along the East side of Front St. to clear all debris and any overhanging shrubs and/or trees from the sidewalk along this route. If you are a homeowner unable to complete this requirement, please let us know.